5/5/2017 Meeting with T. Meixner on Green Infrastructure

5/5/2017 Meeting with T. Meixner on Green Infrastructure

Send her information about lidar analyses. 

Engineering background.

LID installations around Pima County (Tucson and unincorporated). 

https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Floodplain%20Management/Low%20Impact%20Development/LID%20Working%20Group/lid-case-studies-201501.pdf

Anticipate using the UA Library lidar and imagery repository.

Pull the data onto CyVerse. Possibly develop an ECS.